Skip to header Skip to main navigation Skip to main content Skip to footer
Schweitzer Mountain
Where Lake Views Meet Mountain Dreams

Main navigation

  • Home
  • Ski Trip Planning
  • Schweitzer Village Weather Forecast
  • About Schweitzer Mountain

Lift by Lift: How Schweitzer Grew From One Chair to 2,900 Acres

Breadcrumb

  • Home
  • Lift by Lift: How Schweitzer Grew From One Chair to 2,900 Acres
Snow-covered Schweitzer Mountain Resort village and slopes in winter, with skiers below and Lake Pend Oreille in the distance.

Did you know the Schweitzer you ski today was built, quite literally, lift by lift? The resort opened on December 4, 1963, with a day lodge at 4,700 feet and a single mile-long double chairlift. That was enough to start a dream, but not nearly enough to hold it. Almost every decade since, crews have returned in summer to add a lift, open a new basin, or raise a lodge, until one chair grew into 2,900 acres spread across two massive bowls above Lake Pend Oreille.

The first great leap came on the back side. In 1971 the Colburn Basin was developed with two more chairlifts and a small day lodge, the Outback Inn, opening terrain that still feels like Schweitzer's wilder half. More building followed in 1972, the road to the resort was paved in 1973, and Chairlift 7 was added in the summer of 1974 to ease the climb on the front side. The mountain was no longer a single slope. It was becoming a place you could explore for days and still find a new line through the trees.

By the late 1980s Schweitzer was thinking beyond winter. Summer chairlift rides began in 1986, and in 1988 the area was renamed Schweitzer Mountain Resort as it began offering hiking trails and mountain bike rentals. Then came the destination push under Bobbie Huguenin after her father Jim Brown died in April 1989. The original lodge was replaced with a new three-story Headquarters Day Lodge, a detachable quad chairlift arrived in the fall of 1990 along with lights for night skiing, and the 82-room Green Gables Lodge was built, giving visitors a true village to come home to after dark.

The turn of the century brought speed. In 1999 the Green Gables hotel was renovated and renamed the Selkirk Lodge, and one year later Stella opened, then Idaho's only high-speed six-passenger chairlift. Construction began on White Pine Lodge in 2001, and the 75,000-square-foot lodge opened in August 2002 with 50 condominium units and shop and restaurant space at ground level. In 2005 the Idyle Our T-bar expanded skiable terrain by 400 acres into the Little Blue area, making Schweitzer the largest ski resort in Idaho at 2,900 acres.

The modern era kept the pattern going. In 2007 two new lifts, the Basin Express quad and the Lakeview Triple, replaced the original Chair 1 on the front side. Construction began in 2015 on the 9,000-square-foot Sky House summit lodge, which opened in December 2016. In 2019 Schweitzer installed the Cedar Park Express and Colburn Triple in the Outback, adding seven new runs and more gladed terrain. The 31-unit Humbird boutique hotel opened in the village for the 2022-23 winter season, Cambium Spa opened in 2023, and the Creekside Express opened for the 2023-24 season after the old Musical Chairs double was removed.

Walk through the village today and you are walking through that history. The Selkirk and White Pine lodges, Sky House at the summit, and Humbird beside the slopes are all chapters in the same story, written one summer of construction at a time. Next time you ride Stella or glide into the Outback on Cedar Park Express, look around. Every lift line is a reminder that Schweitzer was not built all at once. It was built by people who kept believing the next basin, the next lodge, and the next generation of skiers were worth building for.

Schweitzer Mountain Resort
ResortLife
MountainAdventures
PNWMountains